Around Okanagan Lake, and up to Big White.

We are based in the Central Okanagan and work across the communities around the lake.

Kelowna.

We work in and around Kelowna, from re-sides in established neighbourhoods to new construction and commercial buildings.

West Kelowna.

Commercial and residential work across the west side, including the Public House at Crown & Thieves and The Hatching Post.

Lake Country.

New construction and commercial work, including the Canco at Woodsdale.

Peachland and Summerland.

Re-sides and new homes in both communities.

Penticton and Vernon.

Each has its own page: Penticton and Vernon.

Big White.

Big White has its own page too.

Step Code by municipality.

The table below shows the current Energy Step Code requirement for each community, with sources.

Part 9 Energy Step Code and Zero Carbon Step Code, Okanagan municipalities
MunicipalityEnergy Step Code (Part 9)Zero Carbon Step CodeSources
City of Kelowna Step 3, since 2021-06-01. No local level found; the provincial EL-1 floor applies. S21, S3
A mid-construction airtightness test is not required.
City of West Kelowna Step 3, in effect since 2023-05-01 (the provincial change). Not mentioned on the City page; the provincial EL-1 floor applies. S12, S3
District of Lake Country Step 3 (the province-wide floor since 2023-05-01). No local level found; the provincial EL-1 floor applies. S1, S13, S3
City of Vernon Step 3 for all Part 9 residential buildings, since 2023-01-01 (Building Bylaw 5900, s. 15.3(b)). EL-1 (measure only), Bylaw 5993 adopted 2024-04-22. S15
City of Penticton Step 3 minimum, since 2021-01-01. No local level found; the provincial EL-1 floor applies. S16, S22, S3
A mid-construction blower-door test is required: the Energy Advisor's mid-construction test and compliance report goes in before the insulation and vapour barrier inspection (Building Bylaw 2021-21).
District of Summerland Step 3, since 2022-09-01. EL-1 since 2025-03-10 through the provincial order (the District had not yet added the Zero Carbon Step Code to its own building bylaw). S17
District of Peachland Step 3 equivalent for Part 9 (Step 2 equivalent for Part 3), since 2023-05-01. Not mentioned; the provincial EL-1 floor applies. S18, S3

Start with the project.

Book a visit Send drawings