How the test works.
The Energy Advisor sets a fan in an exterior door and pulls air out of the house until it holds a set pressure. The air the fan has to move to hold that pressure shows how much the building leaks. Your Energy Advisor decides how the house is prepared for the test and confirms the target and the metric that apply to your project.
Test before the drywall.
On our jobs, the mid-construction test typically happens once the interior vapour barrier is done and before the drywall goes up. That way the exterior air barrier and the interior vapour barrier are checked together, and a leak in either one is still easy to find, reach and fix. We recommend booking one on every Step Code build.
What has to be finished first.
The exterior air barrier continuous and taped at every lap and seam. Windows and doors installed and sealed to it. Every penetration through the wall sealed. The interior vapour barrier complete. Temporary openings closed.
Built for the test.
We install the air barrier, seal its transitions and keep it whole while the insulation and cladding go on. We work with your Energy Advisor and the other trades, so nobody cuts the barrier and patches it after we have left.
Step Code by municipality.
Requirements differ across the Okanagan. The table below shows the current step for each community, with its sources. Confirm the requirement with the building department and your Energy Advisor before you price or build.