- Our scope: air barrier and WRB, air sealing, continuous exterior insulation, rainscreen cavity, cladding, soffit, fascia, custom flashings, and gutters. Structure and sheathing are by others; we repair damaged sheathing we find.
- WorkSafeBC account in good standing. Fully insured. Crews trained in fall protection.
- The work ranges from single homes to multi-storey and commercial projects. We size crews to the job.
FOR BUILDERS & ARCHITECTS
Built for the Step Code test.
A blower-door test measures the whole building. We install the air barrier, seal its transitions, and carry the envelope through insulation and cladding, following the project drawings and specification.
How we work
A clear scope. A coordinated start.
- 01 START WITH A CONVERSATION
We usually know the builder. When we do not, a short consult or meeting gives us the expectations and the shape of the job.
- 02 PRICE THE WORK. WRITE THE SCOPE
We price the work and write the scope. The builder reviews and approves it before the job begins.
- 03 MEET BEFORE THE INSTALL
The job starts with a coordination meeting. We line up the work with the project team, then get to the wall.
- 04 INSTALL. THEN FINISH IT OUT
We install the assembly and finish out the scope we priced and agreed to.
Layers and interfaces
The work is in the transitions.
New construction, multifamily and commercial.
On larger buildings we build the envelope to the drawings and specification. That often means commercial wrap or a self-adhered membrane, thermal clips and girts where the assembly calls for them, commercial cladding systems and custom steel trims.
Prequalification
Scope first.
Send the drawings.
Send the drawings, area, schedule and envelope scope. From there we price the work and write the scope for your approval.