Where it fits.
On a re-side, the old cladding is already off, which makes it the right time to add it. On new construction, it is drawn into the assembly from the start, often as part of reaching a BC Energy Step Code target alongside the air barrier.
What we install.
EPS for value, mineral wool where fire performance or vapour openness matters, and polyiso where thickness is tight. Products include Quiktherm EPS, ROCKWOOL and PowerWool mineral wool, and IKO Enerair polyiso, or whatever the project specifies.
How it goes on.
Insulation goes over the water-resistive barrier, then strapping is fastened through it to the framing, following the manufacturer’s fastening tables and the project details. The strapping forms the rainscreen gap and carries the cladding.
What it changes inside.
A warmer wall means fewer cold spots, less condensation risk on the inside face, and a quieter house.
Ask about adding it.
If you are re-siding, ask us to price exterior insulation as an option. Builders, send the drawings and we will price it to the specification.