What the gap does.
Water that gets behind the siding runs down the gap and out at the bottom. Air moving through the gap helps the wall dry. The barrier behind it stays the last line, not the first.
How we build it.
Strapping is fastened over the barrier, or through the exterior insulation when there is some. Insect screen or a vent closure protects the openings at the top and bottom of the cavity.
When it applies.
Where the assembly or the engineer calls for a rainscreen, we build it. Where it is optional (in most cases in BC’s interior), we will tell you what it adds for your wall and price it as an option.
Start with the project.
Builders, send the drawings and envelope scope. Homeowners, book a visit and we will look at your wall.